P roject T itle : Reclaimed Water Booster Pump Station (North-South
Interconnect Pipes under Livingston Road )
A Introduction/Background
Collier County reused approximately 5 billion gallons of treated wastewater in 2004. The majori ty
of the water is used by commercial an d residential users for irrigation. Collier County also uses
reclaime d water for irrigation at various parks and roa dway medians. A small po rtion of the
reclaimed water is used for environm ental mitigation. The reclaimed water system is made up of
over 50 miles of distribution piping, 130 million gallons of wet weather storage, two deep injection
wells, and six large pumpin g stations.
The County serves t wo reclaimed water servi ce a reas referred to as the South and North service
areas. The S outh service area is primarily served by treated effluent from the South County
Water Reclamation Facility (WRF) and the North service area is served by the North County
WRF. The main issue Coll ier County’s reclaimed water program faces is wet weather st orage.
The County has identified a need to con stru ct an in-line booster pump station to add flexibility and
increase efficiency to their reclaim ed water system. The reclaimed water pump station will
enhance the interconnections of the North and South reclaimed water service areas, allowing the
County to serve as many customer s as possible and also maximizing the use of their re claimed
water storage facilities, incl uding the reclaimed water ASR system, located in the North service
area.
B Objectives
This project will allow storage of reclaimed water during the wet season, providing addition al
reclaime d water during the peak deman d. The proj ect will consi st of two phases: Phase 1 is to
connect the North a nd South reclaime d water servic e areas by microtunneling under the
Livingston Road; Phase 2 is to build a reclaimed water booster p umping station.
C Scope of Work
FY2007 work activities include Phase 1: the microtunneling of two 16-inch reclaimed water mains
across Livingston Road.
EXAMPLE 5 - Project Title: JEA 16.5 MGD Floridan Wellfield and RO Expansion Ph II
A Introduction/Background
The City of Port St. Lucie’s has a water and waste water master plan. Sources of water for the
City in the near future are anticipated to be from the Floridan Aquifer. Major impediments to
increasing the use of alternative water supplies includes competition with are communities for
allocations from the same aquifer water source. This project will provide substantial
environmental benefits by replacing water typically supplied from the Surficial Aquifer sources
with brackish water from the Floridan Aquifer. It will also reduce competition for water supplies by
reducing the quantity of Surficial Aquife r source water needed by the City of Port St. Lucie.