Statement of Work Example

STATEMENT OF WORK (SOW) EXAMPLES
E X AM P LE 1 - P r oj e ct Ti tl e : P i n e woo d s RO T r ea tm e nt P l an t and W e ll f i el d Phase II
A. Introduction/Background
Lee County Utilities (LCU) owns and operates the Pinewoods Water Treatment Plant and rel ated
public water supply wellfiel d south of Corkscrew Road approximately one mile east of Interstate I-
75. Currently, the wellfield con si sts of wells withdrawing water from traditional sources, the
surficial and sandstone aquifers. Given the competition for fresh wa ter resources and potential
wetland impacts LCU decided that further develo pment of raw water from traditional sources in
this area was not feasible. Therefore, it was decided that further wellfield development would be
raw water from the Lower Hawthorne aquifer, an alternative source. Lee County has initiated the
construction of Pinewoods Lower Hawthorne Wells and RO Treatment Plant Phase I. In phase I
the storage tank and RO building were completed. The next phase of this project will consist of
completion of the 3.2 million gallons per day (MGD) Reverse Osmosis (RO) Water Treatment
Plant (WTP) and the related Lower Hawthorne Wellfield.
B. Objectives
The objective of this project is to assist in the completion of the Pinewoods Reverse Osmosis
Water Tre atment Plant a nd Lower Hawthorne Wellfiel d Phase II to help meet the City’s water
supply demands.
C. Scope of Work
Fiscal Year 2007 work will complete construction of a 3.2 mgd water treatment facility and four
Lower Hawthorne Floridan Aquifer Prod uction wells. Work will include con stru ction of RO
equipment, high service pumps, me chanical eq uipment, yard piping, wellfield pi ping, electrical
equipment, production wells, monitoring wells, raw water pipelines, and related appurte nances.
EXAMPLE 2 - Project Title: Floridan Aquifer Wells (2) at Dixie Wellfield
A Introduction/Background
The project titled “Dixie Brackish Water Supply / Treatment Facility” is composed of multiple
phases as follows:
Phase 1 – Construct Two Floridan Aquifer Test Wells
Phase 2 – Conceptual Plan for Brackish Wate r Supply and Treatment
Phase 3 – RO Membrane Pilot Testing
Phase 4 – Floridan Aquifer Production Well Design & Constructio n
Phase 5 – Wellfield Conveyance Facilities Design & Construction
Phase 6 – Di xie Reverse Osmosis Facilities Design & Constru ction
This project includes construction work associated with Phase 1, which includes the installation
and testing of two (2) 24-inch diameter by approximately 1,100-foot deep water supply wells to be
completed in the Floridan Aquifer within the City of Fort Lauderdale’s Dixie Wellfield. These wells
will provide raw water to the Peele-Dixie Water Treat ment Plant.
B Objectives
The objective of this projec t is to assist in the construction of a well field necessa ry to supply
Floridan Aquifer water to help meet the City’s water supply dema nds.
Page 1/4
Free Download

Statement of Work Example PDF

Favor this template? Just fancy it by voting!
  •  
  •  
  •  
  •  
  •  
(0 Votes)
0.0
Related Forms
  •  
  •  
  •  
  •  
  •  
18 Page(s) | 2741 Views | 7 Downloads
  •  
  •  
  •  
  •  
  •  
1 Page(s) | 640 Views | 5 Downloads
  •  
  •  
  •  
  •  
  •  
5 Page(s) | 2833 Views | 22 Downloads
  •  
  •  
  •  
  •  
  •  
2 Page(s) | 910 Views | 10 Downloads
  •  
  •  
  •  
  •  
  •  
11 Page(s) | 2334 Views | 4 Downloads