SIP Construction Schedule Template

Project Address: __________________________________________
SDOT Project # _________________________________
SIP CONSTRUCTION SCHEDULE TEMPLATE
The following schedule documents the number of working days for complete installation of each element on the Approved Street
Improvement Plans. Complete installation includes site preparation, installation, and finish work.
Note: The number of pours, number of days of paving, and number of ramps installed per day does not include the number of days
of prep work. The total number of days of prep work and installation should be recorded on the calendar by placing an X under
each day you will be working on each element.
Copy and/or print as many 4 week schedule templates needed to show the entire duration of your street improvement
construction.
If temporary lighting is to be installed you must submit a detailed plan showing the entire scope of temporary lighting with the Pre-
Construction Materials for review and approval.
If temporary signal work is to be installed you must submit a detailed plan showing the entire scope of temporary signal work with
the Pre-Construction Materials for review and approval.
This schedule reflects my best estimate based on the scope of work shown on the Approved Street Improvement Plans. The
construction sequence is based on the best information I have available to me at this time. I understand that changes to my
schedule and/or in the scope of work may cause additional inspection and fees charged to the project.
Completed By: ___________________________________________________ Date: _______________________
Name of General Contractor/Printed Name of Signee
Page 1/7
Free Download

SIP Construction Schedule Template PDF

Favor this template? Just fancy it by voting!
  •  
  •  
  •  
  •  
  •  
(0 Votes)
0.0
Related Forms
  •  
  •  
  •  
  •  
  •  
1 Page(s) | 946 Views | 15 Downloads
  •  
  •  
  •  
  •  
  •  
134 Page(s) | 10317 Views | 70 Downloads
  •  
  •  
  •  
  •  
  •  
1 Page(s) | 6351 Views | 497 Downloads
  •  
  •  
  •  
  •  
  •  
5 Page(s) | 3184 Views | 171 Downloads
  •  
  •  
  •  
  •  
  •  
34 Page(s) | 6374 Views | 171 Downloads