Sample Construction Request for Information

CONSTRUCTION REQUEST
CONTRACTOR COMPANY:
Cramer & Associates
FOR INFORMATION
RFI REQUESTER: RFI DATE:
RFI: 1.0
Robert Cramer 08/16/07
PROJECT NAME: DESIGN FIRM:
Harris Overpass Schemmer
PROJECT NUMBER: CONST. PROJECT MANAGER: RFI RESPONDER: RFI DATE RESPONDED:
701781 Larry Duensing Steve Kathol 08/16/07
Requested Information/Clarification:
The first question is what the City would like to do where the expansion joints go through the median. This applies to
both the strip seal joint (Br sheet 59) and the modular join ts (Br sheet 46). At the barrier r expansion plates. Should there be
something similar at the median, or just a gap left for the expansion joint?
Response:
The plans call for a gap and preformed joint filler in the median at the modular expansion joints and strip seals. See
notation on Br. Sheet 43 and Br. Sheet 59 respectively. The modular joint and strip seal will be continuous in the slab,
below the median. The purpose of the preformed joint filler in the median is to mainly keep debris out of the joint.
Request for Information Page 1 of 1
Page 1/1
Edit Online
Free Download

Sample Construction Request for Information DOC

Favor this template? Just fancy it by voting!
  •  
  •  
  •  
  •  
  •  
(1 Votes)
4.0
Related Forms
  •  
  •  
  •  
  •  
  •  
2 Page(s) | 9935 Views | 651 Downloads
  •  
  •  
  •  
  •  
  •  
13 Page(s) | 14506 Views | 462 Downloads
  •  
  •  
  •  
  •  
  •  
2 Page(s) | 3591 Views | 117 Downloads
  •  
  •  
  •  
  •  
  •  
1 Page(s) | 2356 Views | 159 Downloads
  •  
  •  
  •  
  •  
  •  
4 Page(s) | 4895 Views | 104 Downloads